MODERNIZATION OF MUGHAN HYDRO POWER PLANT


Сфера деятельности:

Энергетика

Патентной право:

Нет

Стартап проект:

Нет

Условия для привлечения инвестиции:

партнерство

Описание бизнес-проекта:

“Mughan SES” OJSC is one of the leading companies that produce ecologically clean electricity in the southern region of Azerbaijan is in Mazrali village of Imishli district. Mughan HPP was built on the Mughan water channel in 1962. The maximum operating power of the station is 4.5 MW. The station was in operation for a while and was privatized in 2004 and reopened after extensive renovations. Design works are currently underway to increase the station’s capacity. The total investment amount, including costs for constructing a crucial service system, purchasing intangible assets, and equipment placement, is expected to be AZN 9,180,000.

Войдите, чтобы увидеть финансовые показатели!

Войдите, чтобы увидеть больше деталей!

Войдите для просмотра документов!

Проект:
L6035616
Дата размещения:
03-08-2023 03:38

О проекте

Название проекта : MODERNIZATION OF MUGHAN HYDRO POWER PLANT

Место, где будет реализован проект : İmişli

Общая стоимость проекта: 9,180,000.00

Необходимая сумма инвестиций: 9,180,000.00

Текущее состояние проекта: Готовый проект

Сайт: smb.gov.az


Количество просмотров: 1794 Делиться:


Kiçik və Orta Biznesin İnkişafı Agentliyi (KOBİA)

Эл. адрес: info@smb.gov.az

Телефон: +994 12 404 04 01